Due to construction at Davis Wade Stadium, a section of B.S. Hood Drive will close on Friday [Aug. 24], beginning at 7 a.m., from Barr Avenue to the entrance to the Cullis Wade Depot parking lot. It will remain closed for the duration of the project, scheduled for completion in August 2014. Access to Cullis Wade Depot will be maintained from Stone Boulevard.